Handling Details of Equipment/ Instruments for Consultancy
Civil Engineering Department
Total Station
Area | DESCRIPTION | SERVICE CHARGE |
1 Hectare (10000m2) |
Plain, Obstruction Free Land without RL |
Rs.10000/- |
Plain, Obstruction Free Land with RL |
Rs.15000/- |
Built up Area without RL |
Rs.15000/- |
Built up Area with RL |
Rs.20000/- |
Concrete
Concrete Mix Design (For each grade) |
Rs.20000/- |
Concrete Cube testing (3 cubes per batch) |
Rs.600/- |
NDT of Concrete
INSTRUMENT/ TESTING | DESCRIPTION | SERVICE CHARGE |
REBOUND HAMMER |
10 POINTS (3 Readings Per Point) |
Rs.2000/- |
UPV TESTER |
Per structure element |
Rs.2000/- |
HALF-CELL POTENTIOMETER |
Corrosion Mapping (Area 1m x 1m) |
Rs.3000/- |
REBAR LOCATOR AND COVER METER |
No. of Bars, Location and Cover Depth (Per structure element) |
Rs.3000/- |